| |
|
|
Blue
Skies employee's,
from the courteous sales staff to the efficient and detailed painters, will
always give you and your house the best service possible. Color changes are
our specialty, and our staff are more than happy to accommodate you in the difficult
process of changing your home's appearance. Customer service and attention to
detail are two of the pillars that make Blue Skies Painting
and Renovations a leader in the industry.
The products we
apply to your house are the third pillar to our success. Sonneborn
is the manufacturer of the breathable, protective, waterproof stucco coatings and high performance sealants. Sico
makes the paint for all wood and metal applications.
Hands are the
most important part of our team, and the fourth pillar Blue
Skies promises every customer. We initially move any vegetation away
from the house, taking great care to provide your plants with the least amount
of stress possible. We then hand wash your house with TSP and bleach. TSP prepares
the surface for painting, and bleach kills any mold spores that may be present.
Blue
Skies takes
pride in the fact that we are a cut above the rest in our preparation work.
In fact, we are pioneers in this field. For instance, on a cedar siding home
that is going to be stained, we seal every crack, knot hole, builders split,
nail head, and shrinkage gaps on the house prior to staining. Most homes that
use our services have curled siding on the south side. We screw down all the
curled siding wherever needed on your home. Blue Skies
now saturates the siding with two very thick coats of Sico
premium stain, and three coats wherever needed.
On stucco homes
we repair all cracks, seal all gaps around doors, windows and wherever the stucco
ends. We replace any missing pieces of stucco. We also test stucco for moisture
and strength. We then apply two very thick coats of Sonneborn
waterproof coating to all your stucco and foundation using brushes and rollers only.
For wood siding and trim that has been previously painted, our preparation is
as follows: we scrape all loose paint, spakkle fill all affected areas, and
sand spakkle to even out levels, and then apply primer. Then we seal
all builders splits, nail heads, gaps and replace loose or missing putty in
windows. We then hand paint two coats of Sico premium,
three coats on south and west sides as needed.
Quality assurance
is achieved through three stages - the first stage includes the painters themselves
checking over each other's work applied by other team members. The second stage includes
the crew chief and the operating manager. The third is an inspection with yourself and the
operating manager at the end of the job.
|
|